| CLIENT'S |
DESCRIPTION OF WORK |
Completion Date |
| Oil & Natural Gas Corporation Ltd |
Diving Services in Krishna Godavarii Basin Offshore OPS. |
20/09/09 on-going |
| Hindustan Oil Exploration Corporation |
Guide 30” Cassion on top of the Conductor Head using Mix Gas System & ROV System |
29/04/09 to 15/05/09 |
| Seatek India Pvt. Ltd |
UWILD Survey for Drill Rig. TRIDENT II |
25/4/09 to 04/05/09 |
| Great offshore Limited |
Installation of Barge Bumpers & Riser Guard in MH, NH And B&S fields (Phase II) |
08/04/09-23/05/09 |
| British Gas Exploration & Production India LTD |
Pre-engineering Survey for Panna Gas Lift Project |
03-03-09 to 20-03-09 |
| Oil & Natural Gas Corporation Ltd |
Installation of Corrosion Cap at well GS-15-AO. |
23/01/09 to 16/03/09 |
| LEO Shipping P. Ltd. |
Underwater Video Survey of Vessel M.V. Blue Whale 110 |
22-01-09 |
| Hall offshore Limited |
Underwater Survey of OSV Sindhu 3 |
15-01-09 |
| Orient Express ship Management Limited |
Bow Thruster Cleaning of Vessel M.V. OEL Mumbai |
14-01-09 |
| Green Ocean Ship Management Pvt. Ltd. |
Underwater Propeller Survey & Blade Cleaning of Dolphin |
December 30, 2008 |
| Inai Kiara (India) Dredging Pvt. Ltd. |
Diving Service for Dredger Sea Chest Survey and Blanking Work. Vessel-M.V. INAI TULIP |
December 18-21-2008 |
| S.K. Dhondty &Co. |
U/W Inspection & Repair of TUG SKD-01 |
December 17-18-2008 |
| Great offshore Limited |
Pre-Eng. Survey & Pre-Construction Survey for Installation of Barge Bumpers & Riser Guard in MH, NH And B&S fields (Phase I) |
29-11-08 to 13/04/09 |
| EGS Survey p. Ltd. |
Pre-Eng. Survey & Pre-Construction Survey for Heera Fields |
12-11-08 to 15-11-08 |
| DS Schiffahrt Gmbh & Co. KG. |
U/W Inspection & Vessel DEJA BHUM |
07-11-08 |
| Prince Marine Transport Service Pvt. Ltd. |
Hall Inspection of Vessel M.V. AHALLYA |
3-11-2008 |
| Ocean Blue Services |
Rescue Operation for the ATLANTIC 47 |
1-11-2008 |
| EGS Survey P. Ltd. |
Cable Route Survey as Mumbai |
31-10-08 to 7-11-08 |
| Seatek India Pvt. Ltd |
UWILD Survey for Drill Rig. J. T. ANGLE |
October 27 to 4th November 2008 |
| Fugro Survey India Pvt. Ltd. |
Survey Services for cable route survey at Mumbai |
October 16 to 18, 2008 |
| Setak India Ltd |
"UWILD" Survey for drill rig J.T. Angle |
September 20 to 26 October 2008 |
| Oil & Natural Gas Corporation Ltd |
Installation of Corrosion Cap at well GS-15-AO. |
August 23 to 30, 2008 |
| Halani Shipping Pvt. Ltd |
Under-Water Survey and cleaning of M.V. Sea Icon |
August 23 to 26, 2008 |
| Orient Express Ship Management Ltd |
Under-Water Survey of Vessel M.V. Orient and applying Epoxy in crack areas |
July 30 to 1st August 2008 |
| BG Exploration and Production India Ltd |
Diving Services for Installation MTA Riser GUARD Clamp at TaptiI Field. |
27th May to 2nd July, 2008 |
| Seatek India PVT. LTD. |
UWILD For Deepwater Frontier - Kakinada |
April 01 to 15, 2008 |
| BG Exploration and Production India Ltd |
Panna clam on project installation AT PB & PF Platforms |
3rdr April to 3rd May, 2008 |
| ONGC |
Diving Services in Krishna Godavarii Basin Offshore OPS. |
22nd April to 20th May, 2008 |
| ONGC |
Score survey and rectification of Abann II |
Apr-08 |
| B.G. Exploration and Production India Ltd |
Inspection of Riser Guard, Barge bumper at Tapti field |
2-Apr-08 |
| Sarku International |
Clearance of wire rope and buoy in offshore water of vessel stepni |
29-Feb-08 |
| BG Exploration and Production India Ltd |
Installation of Conductor Clamp-on-Project at Panna
on Platform PB & PF |
2-May-08 |
| Seatek India |
In water inspection of propeller radar, sea chest and sonar’s for Deep Water Frontier |
25 - Mar - 08 |
| Pride International INC. |
UWILD survey of RIG Pride Pennsylvania |
18 - Jan-08 |
| BG Exploration and Production India Ltd |
Jacket face survey for Conductor Clamp-on Installation on Platform PB & PF |
15 March 20008 |
| Valentine Maritime (Gulf) L.L.C. / Mari dive &Oil Services S.A.E |
Provision of Air Diving Services for Pipe Laying and Barge Stinger Monitoring |
18 - Mar - 08 |
| Oil & Natural Gas Corporation Limited |
Sea Bed Survey, Well Head Capping, Scour Survey and Correction for Rig ABAN II under ONGC Contract – Diving Services for K.G. Basin |
14 - Sep - 08 |
| Valentine Maritime (Gulf) L.L.C. / Mari dive &Oil Services S.A.E |
Removal of Pull Heads for 30", 48" & 48" Pipelines (03 nos) and Installation of Spool Piece & Risers for the 3 Pipelines. |
17 - Jul - 08 |
| Valentine Maritime (Gulf) L.L.C. / Mari dive &Oil Services S.A.E |
Installation of Spool Piece, SBM, Anchor Chains, Sub-Sea Hoses, Umbilical, J-tubes, Floating Hoses, Hawsers etc at SMB No.05. Spool Piece Metrology and Installation of Spool Piece for SBM no. 04 |
17 - Jul - 08 |
| EGS Surveys Pvt. Ltd. |
Pre-Construction Survey for Heera Field Redevelopment Project, ONGC |
12 - Dec - 07 |
| Indian Oil Corporation Limited, Sub- contract from OES ltd, Australia. |
Inc. Marine Spread Assistance Installation of Spool Piece, SBM, Anchor Chains, etc at Paradip |
12th May 2008 |
| Leighton Contractors India |
Free span correction works by installation of Grout Bags at 18 locations for 30" and 48" Pipelines |
12 - Jul - 07 |
| DAS Offshore Engineering Pvt. Ltd. |
Installation of Clamps & Caisson pipe PCE Project at Panna Platform |
1 - Apr - 07 |
| BG Exploration and Production India Ltd |
Removal of Fishing nets and Inspection of 36" and 42" Tapti Tie-in to South Bassien Hazira Trunk Line. |
20 - Feb - 07 |
| BG Exploration and Production India Ltd |
Installation of Riser Protector Guard at Tapti Process Platform |
20 - Feb - 07 |
| Clough Projects International Pty. Ltd. |
Tightening of Riser Clamps and as build survey of Installed Riser Lines for the Panna & Tapti Development Project |
20 - Feb - 07 |
| Clough Projects International Pty. Ltd. |
Installation of Marine Growth Protector for New installed Jackets PH & PJ for the Panna & Tapti Development Project |
5-Mar-07 |
| Saipem (Portugal) Commercio Maritimo |
Replacement of Water jet lines and installation of 40 nos. clamps on the Legs of Drill Rig PN #3. |
5 - Feb - 07 |
| Gujarat State Petroleum Corporation |
Inspection of Template and video Survey on well no #1 for KG #28 at Drill Rig Location. |
10 - Feb - 07 |
| EGS Surveys Pvt. Ltd. |
Pre-engineering Survey for Heera Field Redevelopment Project, ONGC |
10 - Mar - 07 |
| Clough Projects International Pty. Ltd. |
Installation of Marine Growth Protectors at PH & PJ Jacket Locations for Panna & Tapti Field Development Project |
4th Week Jan |
| BG Exploration and Production India Ltd |
Providing Diving Supervisor as HSSE Rep. for Riser Installation Project for BG Exploration & Production India Lid. |
Dec - 06, Jan 07 |
| BG Exploration and Production India Ltd |
Inspection of M. V. Mighty Tide |
6 - Dec |
| Saipem Portugal Commercio Maritimo |
Installation of Clamps and replacement of Water jet Lines on Port, Starboard and Bow legs on Drill Rig PN#3 |
7 - Feb |
| Clough Projects International Pty. Ltd. |
Installation of Riser Clamps and support services for Installation of Risers at PPA & PB locations for Panna & Tapti filed Development Project |
6-Nov |
| Hede Ferro minas Pvt. Ltd |
In water Survey of Vessel MR. Happy Success for IRS Survey |
6 - Nov |
| BG Exploration and Production India Ltd |
Annual Inspection of PANNA SPM, PLEM, C.P readings- Buoy Hull, Anchor Chains, Sub-sea Hose String, Hull Cathodic Protection, Mooring Chains –measurement of chain angle. |
6 - Dec |
| Seatek India, Upstream Petroleum, Australia |
Removal of existing flexible riser line from N1 Platform and removal of Sub-sea Production Buoy with its Clump Weight |
6 - Oct |
| Seatek India, Upstream Petroleum, Australia |
Pre-engineering Survey of N1 Platform of ONGC for installation of New Riser |
6 - Oct |
| Gujarat State Petroleum Corporation Limited |
Inspection and Installation of Template for Drill Rig Perro Neero #3, at KG Basin. |
6 - Aug |
| BG Exploration and Production India Ltd |
Support Services Installation of Riser and Installation of Jacket Strengthening Clamps at TPP |
6 - May |
| BG Exploration and Production India Ltd |
Supply of LP Compressor for Tapti STD Operations |
|
| BG Exploration and Production India Ltd |
Installation of Clamp on crack of 18” spool at PLEM at SPM at Panna Field. |
Feb – March 2006 |
| BG Exploration and Production India Ltd |
Well Head Cap Placement works for Rig ENSCO 53 at Tapti Fields. |
6 - Feb |
| BG Exploration and Production India Ltd |
Riser Inspection Job at Tapti Platforms, 06 Risers at TPP, STA, STC & MTA Platforms. |
Feb – March – Apr 2006 |
| Elcome Surveys Pvt. Ltd. |
Diver Inspection Surveys at LNG Terminal of Ratnagiri Power & Gas Project Ltd. |
Feb – March 2006 |
| Oil & Natural Gas Corporation Limited
| Sea Bed Survey, Well Head Capping, Scour Survey and Correction for Rig ABAN II under ONGC Contract – Diving Services for K.G. Basin |
Jan – Feb 2006 |
| Elcome Surveys Pvt. Ltd. |
Inspection of Jetty Piles and Break Water Survey at Dabhol for reassessment of structures and Subsea assets for RGPPL |
Jan – Feb 2006 |
| DAS Offshore Engineering Pvt. Ltd., |
Installation of barge Bumper & Rub Strips for NC Revamp Project of ONGC. |
Jan – Feb 2006 |
| BG Exploration and Production India Ltd. |
Scour Survey and Correction works of Rig ENSCO 53 at Tapti Field. |
6 - Jan |
| MDL Construction Pvt. Ltd. , |
Diving Services for Installation of Diffuser and 14” Pipeline. |
6 - Jan |
| Jawaharlal Nehru Port Trust |
Shifting of Navigational Buoy in JNPT Channel |
5 - Dec |
| ENSCO Maritime Limited. |
Underwater Inspection of Jetting Lines on Rig ENSCO 50 at Panna Field. |
5 - Nov |
| BG Exploration and Production India Ltd |
Diving Services for inspection and assessment of Leakage of Pipeline near PLEM location. |
5 - Oct |
| Iranian Offshore Engineering & Construction Company IOEC
| Paradip-Haldia Crude Receipt Facility SPM Terminal Pipeline Project. Anchor Piles Installation works
| Dec 2005 Feb 2006
|
| BG Exploration and Production India Ltd |
Support Services for SPM / Tanker Operation and Maintenance, for the year 2005-2006. |
March 2005 to March 2007 |
| BG Exploration and Production India Ltd
| Annual Inspection of PANNA SPM, PLEM, C.P readings- Buoy Hull, Anchor Chains, Sub-sea Hose String, Hull Cathodic Protection, Mooring Chains–measurement of chain angle.
| Sept, Oct & Nov 2005
|
| BG Exploration and Production India Ltd |
Repairs of damaged Piggy back line of Riser at PQ platform. |
4 - Oct |
| Valentine Maritime (Gulf) L.L.C. |
Installation of Riser Clamps for platforms NLM-11 & B-173A, WIH, NE & NH for MHN & H Pipeline Project. |
Nov 2004 up to |
| Jan - 05 |
| Valentine Maritime (Gulf) L.L.C. |
Preparatory jobs of underwater MGR and removal of obstructions by underwater BROCO cutting at various platforms for MHN & H Pipeline Project. |
Nov to Jan 2005 |
| 5 - Jan |
| BG Exploration and Production India Ltd |
Double Banking works for Oil tankers at Panna SPM for BG Exploration and Production India Ltd. |
Nov to May 2005 |
| Oil & Natural Gas Corporation Ltd. |
Diving Services for Offshore Drilling Rigs of ONGC |
Nov 2004 up to |
| 6 - Dec |
| Oil & Natural Gas Corporation Ltd. |
Recovery of SPM Hose |
4 - Jun |
| Shipping Corporation of India. |
Installation of D-shackles and chains for SBM & SPM at ONGC supply base, Mumbai Port. |
4 - Apr |
| BG Exploration and Production India Ltd |
Inspection of Barge Bumpers at PD and PE Platforms for assessment of damage. |
3 - Apr |
| BG Exploration and Production India Ltd |
Annual Inspection of PANNA SPM, PLEM, C.P readings- Buoy Hull, Anchor Chains, Sub-sea Hose String, Hull Cathodic Protection, Mooring Chains –measurement of chain angle. |
3 - May |
| BG Exploration and Production India Ltd |
Thickness Survey of 10 RISERS at PA Platform - 06 Risers, PB, PD, PE & Mukta Platforms – 04 nos. Decoking and cutting window in P.E. Sump Caisson, Tapti Underwater repair jobs, Securing of barge bumper chains, Checking of FREESPAN CORRECTION ON THE PIPELINE, |
3 - Oct |
| 4 - Jan |
| BG Exploration and Production India Ltd |
Additional Work of Installation of 21 Anodes for SPM at Panna Field. |
3 - Mar |
| Elcome Surveys Pvt. Ltd. / Valentine Maritime (Gulf) L.L.C. |
Pre-engineering Riser Face Survey of 14 Riser Locations and 06 Existing Risers as per Scope of Work Provided. |
Apr - May 2004 |
| DAS Offshore Engg. Pvt. Ltd. |
Installation of 03 nos. clamps at Tapti Platform, related to Temporary Compressor Project |
4 - Nov |
| M/S. MAZAGON DOCK LTD., MUMBAI. |
Underwater Installation of CPVC lines on BHN – BHF Platform on firewater pump caisson and Hypo-chlorite Lines. Underwater video survey of all installed lines and clamps under supervision of EIL rep. |
2 - Mar |
| BG Exploration and Production India Ltd |
Pre engineering survey of Riser STA, STC, MTA. |
3 - Jan |
| BG Exploration and Production India Ltd |
Replacement of corroded/damaged piggy clamp 10 nos. on Riser MTA, 06 nos. on Riser STC and 0 nos. on Riser STA. Installation of continuity cable for C.P. improvement on all three Riser Piggy back clamp line. |
Feb - March - April & May 2003 |
| Installation of 1000 kg riser clamps on bottom most location on Riser STC. |
| Installation of 750 kg anode clamp on MB16 and injection grouting inside the member. |
| Scour reading of all six leg and Post C.P. reading of all installed clamp. |
| Installation of barge bumper securing chains and C.P. improvement. Above job carried out in TAPTI field in almost nil visibility water and current was 7 knot. |
| DAS Offshore Engg. Pvt. Ltd. |
Underwater installed 20 nos. of bracelet anodes on PD Platform, C.P. Reading and Video graphy carried out of all installed anodes under DNV Supervision, Installed 4 nos. Barge Bumper on PB, PG, PC and MA platform. |
Mar - 2001 May2001 |
| M/S. ENRON OFFSHORE POWER OPERATION C.V., (DHABOL) |
Underwater diving work on SBM for survey of SBM chain at Enron, Dabhol. |
1 - Apr |
| M/S. OIL & NATURAL GAS CORPORATION LTD., |
Deployment of Diving team for assessment of Diving systems onboard Sagar Bhushan. |
1 - Jul |
| M/S. HYUNDAI HEAVY INDUSTRIES CO. LTD., |
Underwater Pre-Engineering & video survey of 7 jacket of existing Riser to Heera & Neelam field for ‘HV’ Project of ONGC |
1 - Nov |
| M/S. MAZAGON DOCK LTD., MUMBAI. |
Installation of 4 nos. bracelet anodes and replacement of 4” ball valve of approx. 150kg weight on R-15 A PLEM structure in Heera field. Post C.P. reading and video survey of installed valve and anodes recorded at depth of El- 47.00 meter. By using point mooring vessel on turn key basis. |
3 - Sep |
| M/S. MAZAGON DOCK LTD., MUMBAI. |
Replacement of fasteners (Nut Bolt) on ”SR” Platform total 98 no. fasteners changed. Tightened continuity bolt and Videography of all changed fastener, tightened continuity bolts and Videography of all changed fasteners continuity bolts. |
Feb - 98 |
| M/S. BUDA B.V. DREDGING & CONTRACTOR |
Underwater pipeline support and concrete mat placing on pipeline |
March - April 1998 |
| M/S. MAZAGON DOCK LTD., MUMBAI. |
Underwater Cathodic protection survey (C.P. Survey) of jacket B-55 & B-121 at various level and member as per scope of work. Air & gas diving carried up to EL - -70.00 mtr |
Apr - 98 |
| M/S. MAZAGON DOCK LTD., MUMBAI.
| Underwater survey of firewater pump caisson from surface to bottom of strainer underwater Videography of firewater pump caisson on NA and SA platform. |
Mar - Apr 2000 |
| M/S. MAZAGON DOCK LTD., MUMBAI. |
Underwater Pre-engineering survey of B-1 leg for fitment of sump caisson clamp from EL –00 mtr. to EL –60mtr. And underwater video survey of obstructions on B-1 leg BHN (NF) platform. |
Mar - 00 |
| M/S. MAZAGON DOCK LTD., MUMBAI. |
Underwater Replacement of 24 in nos. fasteners at EL –57.00mtr. On conductor clamp on SM platform. Pre & Post video survey carried out Tightening of 4 in nos. continuity bolt |
Mar - 00 |
| M/S. MAZAGON DOCK LTD., MUMBAI. |
Underwater cutting of stainer grating on firewater pump caisson for installation of new stainer and re-fixing of grating by using bolting system on NA platform. Underwater video survey of post installation of stainer. |
Apr 2000. |
| M/S. MAZAGON DOCK LTD., MUMBAI.
| Underwater survey and cleaning of Marine growth up to EL-60mtr. Level and removing and cutting obstructions for installation of sump caisson and clamps on B-1leg BHN (NF) platform. |
Apr - 00 |
| M/S. MAZAGON DOCK LTD., MUMBAI. |
Underwater Installation of 72mtr. long, 2mtr. dia of Sump Caisson with 4 clamps of 7 ton each at elevation –5.5mtr., -19.5mtr., -34mtr., -50mtr. at B1 leg of BHF platform (BHN) and installation of 8nos. bracelet anodes and relocation of 3nos. jacket anode. Installation of Rigid fender on B1-leg. |
Dec 2000 to Mar 2001 |
| M/S. MAZAGON DOCK LTD., MUMBAI. |
Installation of 2 nos. Buoys for the Jacket Load out on Barge in position for HV Project. |
2 - Mar |
| Removal of 2 nos. Buoys after completion of Load out |