CLIENT'S DESCRIPTION OF WORK Completion Date
Oil & Natural Gas Corporation Ltd Diving Services in Krishna Godavarii Basin Offshore OPS.  20/09/09 on-going
Hindustan Oil Exploration Corporation Guide 30” Cassion on top of the Conductor Head using Mix Gas System & ROV System 29/04/09 to 15/05/09
Seatek India Pvt. Ltd UWILD Survey for Drill Rig. TRIDENT II 25/4/09 to 04/05/09
Great offshore Limited Installation of Barge Bumpers & Riser Guard in MH, NH And B&S fields (Phase II) 08/04/09-23/05/09
British Gas Exploration & Production India LTD Pre-engineering Survey for Panna Gas Lift Project 03-03-09 to 20-03-09
Oil & Natural Gas Corporation Ltd Installation of Corrosion Cap at well GS-15-AO.  23/01/09 to 16/03/09
LEO Shipping P. Ltd. Underwater Video Survey of Vessel M.V. Blue Whale 110 22-01-09
Hall offshore Limited Underwater Survey of OSV Sindhu 3 15-01-09
Orient Express ship Management Limited Bow Thruster Cleaning of Vessel M.V. OEL Mumbai 14-01-09
Green Ocean Ship Management Pvt. Ltd. Underwater Propeller Survey & Blade Cleaning of Dolphin December 30, 2008
Inai Kiara (India) Dredging Pvt. Ltd. Diving Service for Dredger Sea Chest Survey and Blanking Work. Vessel-M.V. INAI TULIP December 18-21-2008
S.K. Dhondty &Co. U/W Inspection & Repair of TUG SKD-01 December 17-18-2008
Great offshore Limited Pre-Eng. Survey & Pre-Construction Survey for Installation of Barge Bumpers & Riser Guard in MH, NH And B&S fields (Phase I) 29-11-08 to 13/04/09
EGS Survey p. Ltd. Pre-Eng. Survey & Pre-Construction Survey for Heera Fields 12-11-08 to 15-11-08
DS Schiffahrt Gmbh & Co. KG. U/W Inspection & Vessel DEJA BHUM 07-11-08
Prince Marine Transport Service Pvt. Ltd. Hall Inspection of Vessel M.V. AHALLYA 3-11-2008
Ocean Blue Services Rescue Operation for the ATLANTIC 47 1-11-2008
EGS Survey P. Ltd. Cable Route Survey as Mumbai 31-10-08 to 7-11-08
Seatek India Pvt. Ltd UWILD Survey for Drill Rig. J. T. ANGLE October 27 to 4th November 2008
Fugro Survey India Pvt. Ltd. Survey  Services for cable route survey at Mumbai October 16 to 18, 2008
Setak India Ltd "UWILD" Survey for drill rig J.T. Angle September 20  to 26 October 2008
Oil & Natural Gas Corporation Ltd Installation of Corrosion Cap at well GS-15-AO. August 23 to 30, 2008
Halani Shipping Pvt.  Ltd Under-Water  Survey and cleaning of  M.V. Sea  Icon August 23 to 26, 2008
Orient Express Ship Management Ltd Under-Water  Survey of Vessel M.V. Orient and applying Epoxy in crack areas July 30 to 1st August 2008
BG Exploration and Production India Ltd Diving Services for Installation MTA Riser GUARD Clamp at TaptiI Field. 27th   May to 2nd  July, 2008
Seatek India PVT. LTD. UWILD For Deepwater Frontier - Kakinada April  01 to 15, 2008
 BG Exploration and Production India Ltd Panna clam on project installation AT PB & PF  Platforms 3rdr April  to 3rd  May, 2008
ONGC Diving Services in Krishna Godavarii Basin Offshore OPS. 22nd  April to 20th  May, 2008
ONGC Score survey and rectification of Abann II Apr-08
B.G. Exploration  and Production India Ltd Inspection of Riser Guard, Barge bumper at Tapti field 2-Apr-08
Sarku International Clearance of wire rope and buoy in offshore water of vessel stepni 29-Feb-08
BG Exploration and Production India Ltd Installation of Conductor Clamp-on-Project at Panna
on Platform PB & PF
2-May-08
Seatek India In water inspection of propeller radar, sea chest and  sonar’s for Deep Water Frontier 25 - Mar - 08
Pride International INC. UWILD survey of RIG Pride Pennsylvania 18 - Jan-08
BG Exploration and Production India Ltd Jacket face survey for Conductor Clamp-on Installation on Platform PB
& PF
15 March 20008
Valentine Maritime (Gulf) L.L.C. / Mari dive &Oil Services S.A.E Provision of Air Diving Services for Pipe Laying and Barge Stinger Monitoring 18 - Mar - 08
Oil & Natural Gas Corporation Limited  Sea Bed Survey, Well Head Capping, Scour Survey and Correction for Rig ABAN II under ONGC Contract – Diving Services for K.G. Basin 14 - Sep - 08
Valentine Maritime (Gulf) L.L.C. / Mari dive &Oil Services S.A.E Removal of Pull Heads for 30", 48" & 48" Pipelines (03 nos) and Installation of Spool Piece & Risers for the 3 Pipelines. 17 - Jul - 08
Valentine Maritime (Gulf) L.L.C. / Mari dive &Oil Services S.A.E Installation of Spool Piece, SBM, Anchor Chains, Sub-Sea Hoses, Umbilical, J-tubes, Floating Hoses, Hawsers etc at SMB No.05. Spool Piece Metrology and Installation of Spool Piece for SBM no. 04 17 - Jul - 08
EGS Surveys Pvt. Ltd. Pre-Construction Survey for Heera Field Redevelopment Project, ONGC 12 - Dec - 07
Indian Oil Corporation Limited, Sub- contract from OES ltd, Australia. Inc. Marine Spread Assistance Installation of Spool Piece, SBM, Anchor Chains, etc at Paradip 12th May 2008
Leighton Contractors India Free span correction works by installation of Grout Bags at 18 locations for 30" and 48" Pipelines 12 - Jul - 07
DAS Offshore Engineering Pvt. Ltd. Installation of Clamps & Caisson pipe PCE Project at Panna Platform 1 - Apr - 07
BG Exploration and Production India Ltd   Removal of Fishing nets and Inspection of 36" and 42" Tapti Tie-in to South Bassien Hazira Trunk Line. 20 - Feb - 07
BG Exploration and Production India Ltd Installation of Riser Protector Guard at Tapti Process Platform 20 - Feb - 07
Clough Projects International Pty. Ltd. Tightening of Riser Clamps and as build survey of Installed Riser Lines for the Panna & Tapti Development Project 20 - Feb - 07
Clough Projects International Pty. Ltd. Installation of Marine Growth Protector for New installed Jackets PH & PJ for the Panna & Tapti Development Project 5-Mar-07
Saipem (Portugal) Commercio Maritimo Replacement of Water jet lines and installation of 40 nos. clamps on the Legs of Drill Rig PN #3. 5 - Feb - 07
Gujarat State Petroleum Corporation Inspection of Template and video Survey on well no #1 for KG #28 at Drill Rig Location. 10 - Feb - 07
EGS Surveys Pvt. Ltd. Pre-engineering Survey for Heera Field Redevelopment Project, ONGC 10 - Mar - 07
Clough Projects International Pty. Ltd.    Installation of Marine Growth Protectors at PH & PJ Jacket Locations for Panna & Tapti Field Development Project 4th Week Jan
BG Exploration and Production India Ltd   Providing Diving Supervisor as HSSE Rep. for Riser Installation Project for BG Exploration & Production India Lid. Dec - 06, Jan 07
BG Exploration and Production India Ltd  Inspection of M. V. Mighty Tide  6 - Dec
Saipem Portugal Commercio Maritimo Installation of Clamps and replacement of Water jet Lines on Port, Starboard and Bow legs on Drill Rig PN#3 7 - Feb
Clough Projects International Pty. Ltd.  Installation of Riser Clamps and support services for Installation of Risers at PPA & PB locations for Panna & Tapti filed Development Project 6-Nov
Hede Ferro minas Pvt. Ltd     In water Survey of Vessel MR. Happy Success for IRS Survey 6 - Nov
BG Exploration and Production India Ltd    Annual Inspection of PANNA SPM, PLEM, C.P readings- Buoy Hull, Anchor Chains, Sub-sea Hose String, Hull Cathodic Protection, Mooring Chains –measurement of chain angle. 6 - Dec
Seatek India, Upstream Petroleum, Australia     Removal of existing flexible riser line from N1 Platform and removal of Sub-sea Production Buoy with its Clump Weight  6 - Oct
Seatek India, Upstream Petroleum, Australia     Pre-engineering Survey of N1 Platform of ONGC for installation of New Riser 6 - Oct
Gujarat State Petroleum Corporation Limited    Inspection and Installation of Template for Drill Rig Perro Neero #3, at KG Basin. 6 - Aug
BG Exploration and Production India Ltd   Support Services Installation of Riser and Installation of Jacket Strengthening Clamps at TPP 6 - May
BG Exploration and Production India Ltd    Supply of LP Compressor for Tapti STD Operations  
BG Exploration and Production India Ltd   Installation of Clamp on crack of 18” spool at PLEM at SPM at Panna Field. Feb – March 2006
BG Exploration and Production India Ltd   Well Head Cap Placement works for Rig ENSCO 53 at Tapti Fields. 6 - Feb
BG Exploration and Production India Ltd   Riser Inspection Job at Tapti Platforms, 06 Risers at TPP, STA, STC & MTA Platforms. Feb – March – Apr 2006
Elcome Surveys Pvt. Ltd.    Diver Inspection Surveys at LNG Terminal of Ratnagiri Power & Gas Project Ltd. Feb – March 2006
Oil & Natural Gas Corporation Limited  Sea Bed Survey, Well Head Capping, Scour Survey and Correction for Rig ABAN II under ONGC Contract – Diving Services for K.G. Basin Jan – Feb 2006
Elcome Surveys Pvt. Ltd.    Inspection of Jetty Piles and Break Water Survey at Dabhol for reassessment of structures and Subsea assets for RGPPL Jan – Feb 2006
DAS Offshore Engineering Pvt. Ltd., Installation of barge Bumper & Rub Strips for NC Revamp Project of ONGC. Jan – Feb 2006
BG Exploration and Production India Ltd. Scour Survey and Correction works of Rig ENSCO 53 at Tapti Field. 6 - Jan
MDL Construction Pvt. Ltd. ,              Diving Services for Installation of Diffuser and 14” Pipeline. 6 - Jan
Jawaharlal Nehru Port Trust    Shifting of Navigational Buoy in JNPT Channel 5 - Dec
ENSCO Maritime Limited. Underwater Inspection of Jetting Lines on Rig ENSCO 50 at Panna Field. 5 - Nov
BG Exploration and Production India Ltd Diving Services for inspection and assessment of Leakage of Pipeline near PLEM location. 5 - Oct
Iranian Offshore Engineering & Construction Company IOEC Paradip-Haldia Crude Receipt Facility SPM Terminal Pipeline Project. Anchor Piles Installation works Dec 2005 Feb 2006
BG Exploration and Production India Ltd Support Services for SPM / Tanker Operation and Maintenance, for the year 2005-2006. March 2005 to  March 2007
BG Exploration and Production India Ltd Annual Inspection of PANNA SPM, PLEM, C.P readings- Buoy Hull, Anchor Chains, Sub-sea Hose String, Hull Cathodic Protection, Mooring Chains–measurement of chain angle. Sept, Oct &  Nov 2005
BG Exploration and Production India Ltd Repairs of damaged Piggy back line of Riser at PQ platform. 4 - Oct
Valentine Maritime (Gulf) L.L.C. Installation of Riser Clamps for platforms NLM-11 & B-173A, WIH, NE & NH for MHN & H Pipeline Project. Nov 2004 up to
Jan - 05
Valentine Maritime (Gulf) L.L.C. Preparatory jobs of underwater MGR and removal of obstructions by underwater BROCO cutting at various platforms for MHN & H Pipeline Project. Nov to Jan 2005
5 - Jan
BG Exploration and Production India Ltd Double Banking works for Oil tankers at Panna SPM for BG Exploration and Production India Ltd. Nov to May 2005
Oil & Natural Gas Corporation Ltd. Diving Services for Offshore Drilling Rigs of ONGC Nov 2004 up to
6 - Dec
Oil & Natural Gas Corporation Ltd. Recovery of SPM Hose 4 - Jun
Shipping Corporation of India. Installation of D-shackles and chains for SBM & SPM at ONGC supply base, Mumbai Port. 4 - Apr
BG Exploration and Production India Ltd Inspection of Barge Bumpers at PD and PE Platforms for assessment of damage. 3 - Apr
BG Exploration and Production India Ltd Annual Inspection of PANNA SPM, PLEM, C.P readings- Buoy Hull, Anchor Chains, Sub-sea Hose String, Hull Cathodic Protection, Mooring Chains –measurement of chain angle. 3 - May
BG Exploration and Production India Ltd Thickness Survey of 10 RISERS at PA Platform - 06 Risers, PB, PD, PE & Mukta Platforms – 04 nos. Decoking and cutting window in P.E. Sump Caisson, Tapti Underwater repair jobs, Securing of barge bumper chains, Checking of FREESPAN CORRECTION ON THE PIPELINE, 3 - Oct
4 - Jan
BG Exploration and Production India Ltd Additional Work of Installation of 21 Anodes for SPM at Panna Field. 3 - Mar
Elcome Surveys Pvt. Ltd. / Valentine Maritime (Gulf) L.L.C. Pre-engineering Riser Face Survey of 14 Riser Locations and 06 Existing Risers as per Scope of Work Provided. Apr - May 2004
DAS Offshore Engg. Pvt. Ltd.        Installation of 03 nos. clamps at Tapti Platform, related to Temporary Compressor Project 4 - Nov
M/S. MAZAGON DOCK LTD., MUMBAI. Underwater Installation of CPVC lines on BHN – BHF Platform on firewater pump caisson and Hypo-chlorite Lines. Underwater video survey of all installed lines and clamps under supervision of EIL rep. 2 - Mar
BG Exploration and Production India Ltd Pre engineering survey of Riser STA, STC, MTA. 3 - Jan
BG Exploration and Production India Ltd Replacement of corroded/damaged piggy clamp 10 nos. on Riser MTA, 06 nos. on Riser STC and 0 nos. on Riser STA. Installation of continuity cable for C.P. improvement on all three Riser Piggy back clamp line. Feb - March - April & May 2003
Installation of 1000 kg riser clamps on bottom most location on Riser STC.
Installation of 750 kg anode clamp on MB16 and injection grouting inside the member.
Scour reading of all six leg and Post C.P. reading of all installed clamp.
Installation of barge bumper securing chains and C.P. improvement. Above job carried out in TAPTI field in almost nil visibility water and current was 7 knot.
DAS Offshore Engg. Pvt. Ltd.               Underwater installed 20 nos. of bracelet anodes on PD Platform, C.P. Reading and Video graphy carried out of all installed anodes under DNV Supervision, Installed 4 nos. Barge Bumper on PB, PG, PC and MA platform. Mar - 2001 May2001
M/S. ENRON OFFSHORE POWER OPERATION C.V., (DHABOL) Underwater diving work on SBM for survey of SBM chain at Enron, Dabhol. 1 - Apr
M/S. OIL & NATURAL GAS CORPORATION LTD., Deployment of Diving team for assessment of Diving systems onboard Sagar Bhushan. 1 - Jul
M/S. HYUNDAI HEAVY INDUSTRIES CO. LTD., Underwater Pre-Engineering & video survey of 7 jacket of existing Riser to Heera & Neelam field for ‘HV’ Project of ONGC 1 - Nov
M/S. MAZAGON DOCK LTD., MUMBAI. Installation of 4 nos. bracelet anodes and replacement of 4” ball valve of approx. 150kg weight on R-15 A PLEM structure in Heera field. Post C.P. reading and video survey of installed valve and anodes recorded at depth of El- 47.00 meter.  By using point mooring vessel on turn key basis.  3 - Sep
M/S. MAZAGON DOCK LTD., MUMBAI.    Replacement of fasteners (Nut Bolt) on ”SR” Platform total 98 no. fasteners changed.  Tightened continuity bolt and Videography of all changed fastener, tightened continuity bolts and Videography of all changed fasteners continuity bolts. Feb - 98
M/S. BUDA B.V. DREDGING & CONTRACTOR Underwater pipeline support and concrete mat placing on pipeline March - April 1998
M/S. MAZAGON DOCK LTD., MUMBAI.     Underwater Cathodic protection survey (C.P. Survey) of jacket B-55 & B-121 at various level and member as per scope of work. Air & gas diving carried up to EL - -70.00 mtr Apr - 98
M/S. MAZAGON DOCK LTD., MUMBAI.      Underwater survey of firewater pump caisson from surface to bottom of strainer underwater Videography of firewater pump caisson on NA and SA platform. Mar - Apr 2000
M/S. MAZAGON DOCK LTD., MUMBAI.     Underwater Pre-engineering survey of B-1 leg for fitment of sump caisson clamp from EL –00 mtr. to EL –60mtr. And underwater video survey of obstructions on B-1 leg BHN (NF) platform. Mar - 00
M/S. MAZAGON DOCK LTD., MUMBAI.    Underwater Replacement of 24 in nos. fasteners at EL –57.00mtr. On conductor clamp on SM platform.  Pre & Post video survey carried out Tightening of 4 in nos. continuity bolt Mar - 00
M/S. MAZAGON DOCK LTD., MUMBAI.   Underwater cutting of stainer grating on firewater pump caisson for installation of new stainer and re-fixing of grating by using bolting system on NA platform. Underwater video survey of post installation of stainer. Apr 2000.   
M/S. MAZAGON DOCK LTD., MUMBAI.    Underwater survey and cleaning of Marine growth up to EL-60mtr. Level and removing and cutting obstructions for installation of sump caisson and clamps on B-1leg BHN (NF) platform. Apr - 00
M/S. MAZAGON DOCK LTD., MUMBAI.     Underwater Installation of 72mtr. long, 2mtr. dia of Sump Caisson with 4 clamps of 7 ton each at elevation –5.5mtr., -19.5mtr., -34mtr., -50mtr. at B1 leg of BHF platform (BHN) and installation of 8nos. bracelet anodes and relocation of 3nos. jacket anode.  Installation of Rigid fender on B1-leg. Dec 2000 to Mar 2001
M/S. MAZAGON DOCK LTD., MUMBAI.    Installation of 2 nos. Buoys for the Jacket Load out on Barge in position for HV Project. 2 - Mar
Removal of 2 nos. Buoys after completion of Load out
 
 

 

 